Network overview
About 40 people: 3 single points of failure for everyone
Topology
- About 40 people (fictional), 2 access switches and 4 Wi-Fi access points.
- One internet line; one firewall; one core switch.
- An on-site server or NAS on the core.
- Guest Wi-Fi on its own network.
- One network for staff, servers and devices.
Single points of failure in this model
- Line 1 takes everyone offline.
- The firewall takes everyone offline.
- The core switch takes everyone offline.
- Access switch 1 takes the people connected to it offline.
- Access switch 2 takes the people connected to it offline.
Segmentation
- Guest Wi-Fi is its own network, with internet access only.
- Staff devices, the server, cameras and printers share one network, so one compromised device can reach the rest.
Resilience considerations
- Add a second internet line from a different provider, or a mobile backup.
- With one firewall, keep a saved configuration and a fast-replacement support contract.
- With one core switch, keep a spare and its saved configuration.
- Put the cabinet on a UPS so the core and firewall ride through short power cuts. Power isn’t modelled here.
- The server is one copy of its data: back it up somewhere else and test a restore.
Checks to make on site
- Survey Wi-Fi coverage and interference before settling the number of access points.
- Check each access switch’s PoE budget against the access points and phones it powers.
- Trace and label every uplink and patch lead, and record them in a cabling schedule.
- Confirm firmware and support status for the firewall and switches.
- From a guest device, confirm the internet works and the server and staff devices can’t be reached.
Assumptions and limits
- A fictional, simplified office: one building and one cabinet, with no power, voice system or cloud services modelled.
- Redundant parts are assumed configured and tested. In a real network, that is exactly what needs checking.
- Traffic between internal networks is routed through the firewall. Some designs route it at the core switch instead, with access lists.
- This is a conceptual exercise, not a validated design. A real one starts with a survey of the building, the devices and how people work.